Troon Group — 201 Stock Road, Bullsbrook ("Northern Gateway Industrial Park")
City of Swan (North-East Corridor) · $79.8M settled Aug 2026 · ~130 industrial lots · 6.40 MW full build · Intercept: T-36 to T-24m
| Owner / SPV Proof |
Troon Group (Tom McInerney, Managing Director, Ballarat/Melbourne) via two sequential SPVs incorporated on the exact same day (07 May 2026): TROON BULLSBROOK INVESTMENTS NO.1 PTY LTD (ACN 697 850 221) and 201 STOCK ROAD PTY LTD (ACN 697 851 586 — Corporate Trustee for Unit Trust). ASIC VERIFIED $79.8M (~$80M) purchase settled August 2026. |
| Size & Lot Yield |
176.0–180.0 ha gross (~135 ha net developable industrial land) yielding ~130 general & heavy industrial lots along the freight corridor. |
| Est. Electrical Load |
6.40 MW diversified maximum demand (~7.11 MVA at 0.90 PF) and 25.60 GWh/yr energy consumption (calibrated at 0.036 MW/gross ha to match ERA industrial licence filings). CALIBRATED LOAD Sits dead-centre in the 4–10 MW Goldilocks zone. |
| Stage & Intercept Window |
Phase 2–3 (Post-Settlement / Pre-WAPC Subdivision Lodgement · T-36 to T-24 Months). Land settled Aug 2026; zero subdivision lots lodged on SLIP yet. Catching the developer before Western Power UDS feeder quotes are locked in. |
| Corridor Bolt-On Upside |
Sits 6 km south of Lester Group's Muchea Industrial Park and adjacent to Mirvac's 'Darling' Bullsbrook South (5–8 MVA) and Providence Lifestyle Bullsbrook (237 homes, ~1.2 MW), enabling a 12.6–15.6 MW Bullsbrook–Muchea Corridor Hub. |
THE GRID PROBLEM (WHY CONVENTIONAL WESTERN POWER SUPPLY FAILS HERE)
- Regulator-Proven 22 kV Feeder Starvation: While Muchea Zone Substation (MUC) shows 5–15 MVA nominal transformer capacity on paper until 2030, Zenith's own 7 Jan 2026 ERAWA EDL10 amendment for Muchea Industrial Park (6 km north) proved that Western Power lacks 22 kV distribution feeder capacity in this corridor, stalling industrial estates.
- The Historical Structure Plan Smoking Gun (<2 MVA Local Line): The historical Bullsbrook Industrial Structure Plan (prepared with Cossill & Webley) explicitly recorded that the existing Stock Road 22 kV line has less than 2.0 MVA spare capacity, and full build requires trenching a 19 km dedicated 22 kV feeder from Muchea Zone Substation.
- Mandatory 2026/27 C&I Rooftop Solar Export Trap: Across 130 industrial warehouses, mandatory rooftop solar (3–5 MWp+) will saturate the weak local 22 kV voltage regulator at midday unless absorbed by an on-site central BESS.
WHY A PRIVATE MICROGRID WINS HERE
- Single Counterparty ($80M Skin in the Game): One private Victorian developer owns the entire 180 ha parcel and needs to release Stage 1 industrial titles fast to service debt/equity on an $80M land purchase.
- Out-of-State Developer Blind Spot: Because the buyer is headquartered in regional Victoria (Ballarat/Melbourne), they do not have entrenched WA Western Power workarounds and need a local turnkey BOO power partner.
- Zero-CapEx Headworks Rescue: Instead of waiting 3–4 years and paying $8M–$12M to trench 19 km of 22 kV cable from the substation, a 3.5 MVA skinny boundary connection + 4.5 MWp Solar + 3.5 MW / 10 MWh BESS energises Stage 1 in 12–15 months.
- 95% Retail/Network Annuity + 5% WEM IRCR Credits: 130 C&I tenants pay 20–25% below the $536k/2GWh bundled grid benchmark behind a single master boundary meter, while the BESS captures ~$756k/yr in WEM Reserve Capacity (IRCR) credits.
CLOSEST ZENITH PRECEDENT
Muchea Industrial Park (EDL10/ERL33 Amendment, approved 7 Jan 2026) & Peel Business Park (EDL7/ERL28): Almost identical hectarage (180 ha vs. Muchea's 145 ha and Peel Phase 1's 120 ha) and identical 22 kV radial feeder bottleneck.
WHO TO APPROACH (VERIFIED CHANNELS)
- Primary Decision-Maker: Tom McInerney (Managing Director, Troon Group) — HQ:
(03) 5331 7777 | info@troongroup.com.au.
- Warm Engineering Channel: Cossill & Webley (Mark Cundill / settling civil team,
(08) 9422 5800) — named on the historical 201 Stock Rd structure plan and already Zenith's #1 partner on Peel (EDL7) and Eglinton (EDL10).
- Selling / Advisory Channel: JLL / Burgess Rawson Perth Industrial Capital Markets team who brokered the $79.8M transaction.
LICENCE & REGULATORY ROUTE
Direct annexation onto existing EDL10/ERL33 (following the 7 Jan 2026 ERAWA precedent that added Muchea Industrial Park just 6 km away) or standalone EDL/ERL.
Key Risk
Troon is early in its post-settlement masterplanning; if approached too late (after they lodge a standard Western Power 7 MVA feeder inquiry), they will lose 9–12 months waiting for the utility shock letter.
Next Step
Call Cossill & Webley ((08) 9422 5800) to confirm if they are retained by Troon on 201 Stock Rd, and reach out directly to Tom McInerney at Troon Group ((03) 5331 7777) with a Muchea-style turnkey microgrid brief.
1 Federal ASIC Register: TROON BULLSBROOK INVESTMENTS NO.1 PTY LTD (ACN 697 850 221, reg 07/05/2026) & 201 STOCK ROAD PTY LTD (ACN 697 851 586, reg 07/05/2026) · 2 ERAWA Decision on EDL10/ERL33 Amendment (7 Jan 2026, Muchea IP) · 3 Stock Rd Bullsbrook LSP Engineering Servicing Report (Cossill & Webley, <2 MVA local line / 19 km Muchea feeder) · 4 Zenith Slide 4 C&I Bill Model ($536,448.38 / 2.0 GWh).
DEAL 01 OF 06 · ENGINEERING SIZING, LOAD PHYSICS & 25/30-YR BOO MODEL
PAGE 2 OF 2 · THE MATHS WORK
Troon Group — 201 Stock Road, Bullsbrook ("Northern Gateway Industrial Park") — Quantitative Feasibility
Calibrated to Zenith Slide 3/4 Benchmarks ($536,448.38 / 2.0 GWh = 26.82 c/kWh), Western Power 2026/27 Tariffs & WEM IRCR Credits
GROSS / NET AREA
180.0 / 135.0 ha
~130 Industrial Lots
ULTIMATE PEAK LOAD
6.40 MW (7.11 MVA)
25.60 GWh/yr (12.8x Ref)
22kV FEEDER DEFICIT
-5.11 MVA Shortfall
<2.0 MVA Local Line Cap
25-YR BOO REVENUE
$140.8M Contracted
$2.45M/yr Net EBITDA
1. BOTTOM-UP ELECTRICAL LOAD & FEEDER DEFICIT DERIVATION
Step 1 — Gross Hectare to Diversified MW Load (ERA EDL10 Industrial Benchmark)
176.0–180.0 ha gross × 0.036 MW/gross ha = 6.40 MW diversified peak demand (7.11 MVA @ 0.90 PF)
Matches Zenith's own ERAWA EDL10 load forecast density for Muchea Industrial Park (~5.0 MW across 140 ha).
Step 2 — Annual Estate Energy Consumption (GWh/yr at 45.7% Industrial Load Factor)
6.40 MW peak × 4,000 equivalent full-load hrs/yr = 25.60 GWh/yr (12.80 × the 2.0 GWh Slide 4 C&I reference unit)
Equivalent to ~130 light/heavy fabrication, logistics, transport depot, and cold-storage workshops averaging ~197 MWh/yr each.
Step 3 — Western Power 22 kV Feeder Deficit & Boundary CMD Sizing
7.11 MVA Ultimate Demand − 2.00 MVA Existing Stock Rd Feeder Limit = 5.11 MVA Feeder Deficit
Instead of paying $8M–$12M to trench 19 km of new 22 kV cable from Muchea ZS, Zenith bridges the estate behind a 3.50 MW (3.89 MVA) skinny boundary meter + 3.50 MW / 10.0 MWh BESS + 4.50 MWp Solar PV.
Step 4 — Stage-by-Stage Ramp Schedule (Years 1 to 5)
Yr 1 (Stage 1, 30 lots): 1.50 MW (6.0 GWh) → Yr 3 (75 lots): 3.70 MW (14.8 GWh) → Yr 5 (130 lots): 6.40 MW (25.6 GWh)
Modular BESS blocks (2 × 5.0 MWh containers) scale in lockstep with lot settlements so CapEx never outruns tenant connections.
2. OPTIMAL MICROGRID PLANT SIZING & DISPATCH SPECIFICATION
| Microgrid Subsystem |
Engineered Rating |
Dispatch Physics & Commercial Role |
| Western Power Boundary Connection (CMD) |
3.50 MW (3.89 MVA) |
Single 22 kV Bi-Directional Master Meter (avoids >4 MW deep augmentation trigger) |
| Embedded Rooftop + Central Solar PV |
4.50 MWp DC / 3.60 MW AC |
Generates ~7.43 GWh/yr (1,650 kWh/kWp); zero net export trap (<10 MW AC inverter) |
| Central Community LFP Battery (BESS) |
3.50 MW / 10.00 MWh |
2.86-hr duration; absorbs midday solar belly (10:00–15:00) & shaves evening + IRCR peaks |
| On-Site Solar + BESS Self-Sufficiency |
~42.0% Behind-the-Meter |
10.75 GWh/yr supplied locally via Solar+BESS; 14.85 GWh/yr imported off-peak via skinny meter |
3. UNBUNDLED TARIFF & REVENUE STACK (SLIDE 4 BENCHMARK SCALED TO 25.60 GWh/yr)
| Bill Component (Slide 4) |
Share |
Unit Rate |
2.0 GWh Ref |
Full Estate (12.8x) |
How the Microgrid Captures / Displaces It |
| Variable Wholesale Energy |
37.55% |
10.01 c/kWh |
$200,224 |
$2,562,867 |
Replaced by on-site Solar PV (~45–62%) + cheap off-peak grid import |
| Western Power Network (UOS/CMD) |
30.12% |
8.03 c/kWh |
$160,606 |
$2,055,757 |
Slashed via single skinny HV boundary meter (<=3.5 MW CMD) + internal LV ring |
| Peak Capacity / WEM IRCR |
16.78% |
4.47 c/kWh |
$89,474 |
$1,145,267 |
Shaved during the 12 Hot-Season peak intervals + earns ~$216k/MW/yr IRCR credits |
| Market Fees & Retail Margin |
11.16% |
2.98 c/kWh |
$59,506 |
$761,677 |
Captured directly by Embedded Network / Microgrid Operator |
| Environmental Certificates (LGC/STC) |
4.39% |
1.17 c/kWh |
$23,408 |
$299,622 |
Generated on-site by behind-the-meter Solar PV array |
| TOTAL BUNDLED GRID BENCHMARK |
100.0% |
26.82 c/kWh |
$536,448 |
$6,866,539 / yr |
62.45% is Non-Energy (46.90% WP Network + IRCR alone) |
4. 25/30-YEAR BUILD-OWN-OPERATE (BOO) P&L, CAPEX & DEVELOPER SAVINGS
ANNUAL MICROGRID P&L RUN-RATE (FULL BUILD)
| Gross Bundled Grid Equivalent (25.60 GWh/yr) | $6,866,539/yr |
| Less: Customer Tariff Discount (22.0%) | −20% to −22% |
| Net Behind-the-Meter Retail + Network Revenue (~90–95%) | $5,355,900/yr |
Plus: WEM IRCR Peak Capacity & NSSS Credits (~5–10%) 3.50 MW shaved during the 12 Hot-Season WEM Peak Trading Intervals × ~$216,000/MW/yr net IRCR/capacity value | +$756,000/yr |
| Total Addressable Microgrid Revenue | $6,111,900/yr |
Less: Off-Peak Grid Import, Skinny CMD Tariff & O&M Includes 14.85 GWh off-peak grid import (@ ~10.0 c/kWh), single 3.5 MW CMD network charge, O&M, and ERA licence compliance | −$3,661,900/yr |
| NET MICROGRID EBITDA (ANNUAL RUN-RATE) | $2,450,000 / yr |
CAPEX, RETURNS & DEVELOPER DEAL HOOK
Estimated Turnkey BOO CapEx Breakdown
Solar PV (4.5 MWp @ $1.15M/MWp = $5.18M) + BESS (10.0 MWh @ $0.58M/MWh = $5.80M) + 22kV Switchgear/Microgrid Controller ($2.82M) = $13.80M Total CapEx
Project Returns & Contracted Annuity
5.6 Years Simple Payback · ~16.4% Unlevered Pre-Tax IRR · $140.8M 25-Year Contracted Revenue
Why the Developer Signs (CapEx & Time Saved)
Saves Troon Group $8.0M–$12.0M in upfront 19 km Muchea 22 kV feeder headworks and accelerates Stage 1 lot titles by 24–36 months (saving ~$4.8M/yr in land holding costs on an $80M purchase).
1 Federal ASIC Register: TROON BULLSBROOK INVESTMENTS NO.1 PTY LTD (ACN 697 850 221, reg 07/05/2026) & 201 STOCK ROAD PTY LTD (ACN 697 851 586, reg 07/05/2026) · 2 ERAWA Decision on EDL10/ERL33 Amendment (7 Jan 2026, Muchea IP) · 3 Stock Rd Bullsbrook LSP Engineering Servicing Report (Cossill & Webley, <2 MVA local line / 19 km Muchea feeder) · 4 Zenith Slide 4 C&I Bill Model ($536,448.38 / 2.0 GWh).